Tashkent Metro, Line 3
О проекте
New line of the Tashkent Metro with a length of 12 km and 11 stations. A tunnel and station ventilation system with smoke extraction function was required.
Задача
High-temperature version (up to 400°C), vibration resistance, compliance with Uzbek standards (SNiP RU), delivery under railway transport conditions through Uzbekistan.
Решение
Smoke exhaust valves, version E 600, with Belimo reversing actuators. Heavy-duty silencers for tunnel conditions. All documentation in Russian and Uzbek languages.
Результат
Equipment installed at all 11 stations. System passed smoke extraction tests. Delivery timelines met — 38 days from payment to arrival at site.